Sliding Aluminum Frame Movable Folding Partition Walls For Conference Room
Product Details:
Place of Origin: | Guangdong |
Brand Name: | BANGE |
Certification: | ISO9001 |
Model Number: | 85 mm folding partition walls |
Payment & Shipping Terms:
Minimum Order Quantity: | 10 square meters |
---|---|
Price: | US Dollars 80 - 120 per square meters |
Packaging Details: | Carton package, MDF batten on four section sides , foam board on both front face. |
Delivery Time: | 15-20 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 50000 square meters per month |
Detail Information |
|||
Open Style: | Sliding | Product Name: | Folding Partition Walls |
---|---|---|---|
Feature: | Sound Proofing | Size: | 85 Mm |
Color: | Accept Customized | Application: | Banquet Hall,office,function Room |
Panel Width: | 500 Mm--1230 Mm | Door Material: | Melamine Board |
Surface: | Melamine,leather,fabric,plywood | Position: | Interior |
Width: | 85 Mm(3 1/4 Inch) | ||
High Light: | acoustic folding partition,soundproof folding partition |
Product Description
Conference Room Sliding Aluminum Frame Movable Folding Partition Walls for Soundproof
Details of Folding Partition Walls System
Folding partition walls are specified where functional space delineation is an integral element within the partition project.
Due to their flexibility and cost effectiveness they allow large rooms to be conveniently sub-divided to maximize space utilization.
Principle applications include office interiors, meeting rooms, sports and leisure facilities, schools, colleges, churches, conference and function suites, exhibition centers, banks and restaurants.
To create a better sound insulation folding partition walls, we put high density fiberglass inside the partition frame, Sourcing from imported world famous fiberglass brand " Owens Corning" which is the best sound insulation cotton manufacturer.
Specifications of Folding Partition Walls System
Increasingly, flexible and efficient space utilisation is becoming a must for offices, hotels, exhibition centres, studios and similar. With our movable partition system, you can have more choice to arrange your space rather than a room. Is not only provide visual insulation but also sound insulation which give you a more private space, the sound insulation could be 35dB to 55dB, as well as a concreat wall.
Folding partition wall is made of high quality anodized aluminum frame with environmentally composite materials.the panels move on a ceiling track with no requirement of floor guides or rails which provide you a better environment.
Product name | Movable paritition wall |
Color | Customized |
Material of Frame | Aluminum Frame |
Material of Soundproofing | Glass Wool, Steel Plate, Wooden Board |
Application | restaurant |
Style | Modern Banquet Hall Folding Partitions |
Size | Customizied |
Feature | Assemble |
Service | OEM ODM Trial |
Finish | veneer,melamine, fabric or customized |
Product Keywords | acoustic folding partition walls,aluminum folding partition walls |
How to install the folding partition walls
1. After the folding partition walls rail is transported to the construction site, the construction personnel should first understand the general decoration style of the site, including the ceiling shape, the ground shape, whether there is a skirt line on the wall, etc., timely communicate with the on-site woodworker, and then release the line to determine the track installation. position;
2. After the horizontal line is placed, the construction side will determine the layout direction of the air-conditioning duct fire-fighting pipe, and it is convenient to determine the steel structure installation form, whether it is a straight pull or a diagonal support or a U-slot fix. These are responsible installation teams. Do the preparation before the construction, otherwise work and do things, when the impact on the site construction layout, but also to rework, seriously affect the construction progress, will also bring unnecessary trouble to Party A;
3. After the track is installed, the track level will be self-checked again, and finally the steel structure will be rust-proofed, and then Party A will be notified and the position of the track movable port will be clearly stated. When the ceiling is clearly indicated, it cannot be fixed with the track. Otherwise, loading and unloading The door panel will likely damage the integrity of the ceiling.